Building & Permits
Paul Hampton
Building Inspector
Phone: (360) 374-5412 ext. 107
Building Permit Applications
Building Permit Fee Schedule
Total Valuation |
Fee |
$1.00 to $500.00 | $24.00 |
$501.00-$2,000.00 | $24.00 for the first $500.00 plus $3.00 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
$2,001.00 to $40,000.00 | $69.00 for the first $2,000.00 plus $11.00 for each additional $1,000.00, or fraction thereof, to and including $40,000.00 |
$40,001.00 to $100,000.00 | $487 for the first $40,000.00 plus $9 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $1027 for the first $100,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 |
$500,001.00 to 1,000,000.00 | $3827 for the first $500,000.00 plus $5 for each additional $1,000.00, or fraction thereof, to and including $1,000,000 |
$1,000,001.00 to $5,000,000.00 | $6,327 for the first $1,000,000.00 plus $3 for each additional $1,000.00, or fraction thereof, to and including $5,000,000.00 |
$5,000,001.00 and over | $18,327 for the first $5,000,000; plus $1 for each additional $1,000 or fraction thereof |
In addition, a state fee of $6.50 is charged for each permit.
Other inspections and fees:
|
Inspection fees for set-up of manufactured homes:
Single-wide: $106.50 Double-wide: $131.50 |
Driveway Permit Process & Application
Application for Driveway Approach
In the City of Forks, the city utility superintendent has the authority to approve access to city streets as well as access to SR 101 (within the city limits), ensuring that access to 101 complies with WSDOT specifications.
Permit Process
- The public may obtain a no-fee permit application from the Utility Superintendent’s office.
- The applicant will complete the application and submit it to the Utility Superintendent of approval, modification, of denial.
- The Utility Superintendent will, within 14 days of receipt review the application and if approving the application, shall determine in writing which of the following design standards for the access approach shall be required:
- Commercial
- Non-commercial – type A or type B